VIRAT GROUP OF COMPANIES

VIRAT CONSTRUCTION COMPANY

(ISO – 9001 -2015 CERTIFIED COMPANY)

VDU INFRA PROJECTS PRIVATE LIMITED

(ISO – 9001 -2015 CERTIFIED COMPANY)

Virat Group of Companies is a pan India leader in design, detailed engineering and construction of Reinforced Soil Wall (RSW) system.We have also proven track record for turnkey projects for execution of wastewater & sewage treatment plants, geo membrane lining systems, Gabion structures, slope protection work as well as wrap around systems.

LANDMARK PROJECTS

  • Construction of Interchange at Km. 91+875 of PC (Junction with EPC and Yamuna Expressway) and providing connectivity to 60 mtr. & 30 mtr. Wide road of Yamuna Expressway in the State of Uttar Pradesh through an Engineering, Procurement & Construction (EPC) Mode.
  • Six Laning of Bihar - Jharkhand Border (Chordaha) to Gorha section of NH-2 form Km 249.525 to Km 320.810 in the State of Jharkhand under NHDP Phase V on EPC Mode. - Construction of Dry Lean Concrete (DLC) and Pavement Quality Concrete (PQC) including cost of RMC plant, paver, transportation and laying of concrete and excluding of material cost from Ch. 249.525 KM to 285.150 KM at project site
  • Work Order for Ground improvement works using Prefabricated Vertical Drains(PVD). Design, Supply & Installation of RE wall for Construction of Interchange cum road bridge at LC 263 at Kutch Salt Junction under EPC mode at Kendla, Gujarat.
  • Construction of Eight Lane Expressway starting before KMP Expressway and ends at Ch. 47+000 near Khanpur Ghati (Km 18+500 to Km 47+000) section of Delhi - Vadodara Green field Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in State of Haryana.
  • Construction of Reinforced Soil Earth Wall Work for Development of 1.4.1-1 - 147 (Old NH - 8 C) including 6-leaning with service road on either side (Package - Ill) in the state of Gujarat on EPC basis. (Height up to 12mtr.) - Approx Qty 24000 Sq.m
  • Construction of Reinforced Earth Retaining Wall up to a 8 mt. height including 1 mt. foundation depth for Phi value 32 degree in the project "Development of NH-31 to 4 lane Configuration from Km. 551.360 to Km. 563.260 (Ghoshpukur to Bihar More, Bagdogra) in Darjeeling District, West Bengal Under EPC Mode" on Piece Rate Work basis.-Approx Qty 15000 Sq.M
  • Construction of reinforced Soil wall for phi Value 30 including , Provision of design, Provision of precast blocks & Erection, Supervision of Casting and Erection & all activities, Supply of Geogrid and Geotextile in suitable lots and
    Construction of Frictional Slab and Crash Barrier for Pune Satara Toll Road Project
  • Construction of Reinforced Soil Earth Wall Work for Development of 1.4.1-1 - 147 (Old NH - 8 C) including 6-leaning with service road on either side from km 31/300 to 35/480 (Package - Ill) in the state of Gujarat on EPC basis. (Height up to 12mtr.) - Approx Qty 45000 Sq.m
  • Balance work of Four-laning of Raiganj - Dalkhola section of NH-34 from km 398.00 to km 452.750 (Package-V) under NHDP Phase-III in the state of West Bengal under NHDP Phase III on EPC mode Carry out design , supply, construction and erection of Reinforced Earth Wall (Complete Job) - Qty 100000 Sq. m.
  • Providing , design, drawings and construction supervision of RE wall of various heights  1.0 M to 12.0 M as per MOTRTH for Nagpur - Mumbai Express way Package 01 (approx qty - 75000 sq.m)
  • Six Laning of Bihar - Jharkhand Border (Chordaha) to Gorha section of NH-2 form Km 249.525 to Km 320.810 in the State of Jharkhand under NHDP Phase V on EPC Mode. - Work order for construction of Reinforced Earth Retaining wall with Geogrid for various structure at project Site.
  • Design, Casting and Erection of Reinforced Soil Wall of 90,000 sqmtr and Crash Barrier with Friction Slab with all allied activities for six lanning of Shamlaji to Mota Chilodha from KM 401.200 to KM 494.410 section of NH-8 in the State of Gujarat under NHDP Phase - V (PKG-VI) on Hybrid Annuity Mode.
  • Design and Construction of Reinforced Soil Wall of 1,05,000.00 sqmtr at LC 214, LC 220, LC 216, LC 208, LC 208B, LC 211, LC 199, LC 201, LC 227, LC 158 B, LC 124, LC 137, LC 130-C, LC 102, LC 81 locations of DFCC project in state of Gujarat.
  • Design and Construction of Reinforced Soil Wall of 55,000.00 sqmtr at six lanning from existing km 494.410 to existing km 509.550 of NH-8 up state of Gujarat on EPC mode under NHDP Phase V (Package VII).
  • Design and Construction of Reinforced Soil Wall of 35,000.00 sqmtr in project of Upgradation to 6 lane with paved shoulders of Bagodara - Limbadi section of NH 8A (New NH47) from Km 56+000 to km 99+000 on EPC mode in the state of Gujarat (Package 2).
  • Design and Construction of Reinforced Soil Wall of 69,000.00 sqmtr in project of Upgradation to 6 lane with paved shoulders of ahmedabad - Bagodara section of NH 8A (New NH47) from Km 16+000 to km 56+000 on EPC mode in the state of Gujarat (Package 1).

Our Valuable Clients